We designed, produced and installed a range of flown fabric structures which could be re-used and re-purposed whilst being able to integrate with secondary structures and AV solutions. Installation time; a maximum of six hours.
We redesigned standard box and cube frames which were adapted to permit faster assembly on-site. There were three cube structures to the front of the stand that needed to integrate to a truss system neatly, which in-turn carry LED tiles. We worked with the rigging contractor to adapt our design to produce bespoke ‘cubes’ with graphics to three visible sides whilst integrating LED tiles to the face and underside of each.